Desk is staffed 8am to 8pm, all week finishedhomeservice@gmail.com

Company

Occupied houses, not vacant lots

Finished Home Services of Utah takes apart and rebuilds rooms people are still living around. Kitchens, baths, lower levels, decks, and the smaller lists that show up in a house that has already been used.

Jobs on the board

The day-to-day work is multi-room updates, kitchens, baths, lower levels, decks and patios, and short repair lists. Pipe and wire scopes go to tradespeople who hold those licenses.

What stays blank

This page leaves tenure, star counts, and warranty length empty until each one can be shown. The state license number will be added in this sentence when it is assigned. Homeowners can confirm a license on the Utah licensing lookup.

Request an estimate

Gray house with a wide porch, a stock photo and not a Finished Home Services of Utah job
Stock porch photo. Not a company project.

Where those jobs show up

Owners asking about basement remodeling in Lehi usually want the lower floor usable by the next school year.

A bid for basement remodeling in Salt Lake City should name the stairs and the water heater before drywall.

During scheduling, basement remodeling in Sandy is discussed room by room, including whether anyone sleeps down there.

Before demo, basement remodeling in Provo cannot ignore a duct that already brushes a tall person's hair.

On the written list, basement remodeling in Spanish Fork is filed with that city when a bedroom is on the drawing.

After the visit, home remodeling in Lehi keeps one bath working while another room is closed.

At the desk, home remodeling in Salt Lake City often ties the kitchen opening to the family room beside it.

When the rooms are listed, home remodeling in Sandy names the flooring that has to continue through the hall.

Once the city is known, home remodeling in Provo lists bearing walls before anyone picks a paint color.

With the house occupied, home remodeling in Spanish Fork can include the back door when a deck is on the same sheet.

On a normal bid, basement finishing in Lehi stays on hold until the slab has been watched after rain.

Before any order is placed, basement finishing in Salt Lake City marks the furnace location on the first sketch.

When snow is still a factor, basement finishing in Sandy adds a bath only when the shower pan is part of the drawing.

If the family is staying, basement finishing in Provo does not label a room a bedroom until the egress opening exists.

On the first sketch, basement finishing in Spanish Fork starts by looking for old water stains on the concrete.

People who search basement finishing Utah still have to write the city on the form.

Email Free estimate